Other than that, the metal grid cage is installed - meaning we can now fill the casing with concrete and be done with it. The engineer sent back the signed Baubeginnsanzeige this morning - which means we are pretty much good to go. The next steps are coordinating the roof, the window installation, the plastering and the internal partitioning and flooring.
Casing had to be reopened to allow fitting the cage |
The R188 cage sits perfectly in the casing |
M20 Leerrohr for Cat7 network in our room |
A wire to pull the network cable through the Leerrohr |
M20 Leerrohr will run in the same slot as the heating pipes |