Other than that, the metal grid cage is installed - meaning we can now fill the casing with concrete and be done with it. The engineer sent back the signed Baubeginnsanzeige this morning - which means we are pretty much good to go. The next steps are coordinating the roof, the window installation, the plastering and the internal partitioning and flooring.
![]() |
Casing had to be reopened to allow fitting the cage |
![]() |
The R188 cage sits perfectly in the casing |
![]() |
M20 Leerrohr for Cat7 network in our room |
![]() |
A wire to pull the network cable through the Leerrohr |
![]() |
M20 Leerrohr will run in the same slot as the heating pipes |